Case Studies

View All

Water

Cable Beach Foreshore Redevelopment

IKAD was required to fabricate and assemble a series of radial stackers to improve ore handling and reduce downtime in the crushing system. While the base design was supplied by the client, IKAD was responsible for developing detailed fabrication drawings and executing full in-house manufacture, surface treatment, and assembly.
Cable Beach Foreshore Redevelopment
06 JAN
2026
Arrow

Defence

Underwater A-Bracket Bearing Repair

IKAD was required to address excessive wear in an A-bracket bearing, a key structural element supporting the vessel’s propeller shaft. With no dry dock access available and significant operational risk associated with delays, IKAD was tasked with developing and executing a first-of-class underwater repair solution.
Underwater A-Bracket Bearing Repair
22 OCT
2025
Arrow

Mining & Minerals

Pilbara Expansion Project

IKAD was required to support a major upgrade of a clients lithium operations. The scope involved the end-to-end delivery of complex fabricated and assembled components, with all work aligned to milestone-driven production deadlines. This long-term partnership extended from early 2022 to late 2023.
Pilbara Expansion Project
24 MAR
2023
Arrow

Mining & Minerals

Radial Stackers

IKAD was required to fabricate and assemble a series of radial stackers to improve ore handling and reduce downtime in the crushing system. While the base design was supplied by the client, IKAD was responsible for developing detailed fabrication drawings and executing full in-house manufacture, surface treatment, and assembly.
Radial Stackers
06 JUN
2022
Arrow

Defence

MV Sycamore

IKAD was required a complete overhaul of the Sycamore’s onboard access systems to meet updated operational and safety standards. This included the removal and replacement of all existing stair structures and the fabrication of entirely new access solutions. The works had to be delivered with minimal disruption to the vessel’s operational availability.
MV Sycamore
06 JUN
2022
Arrow

Mining & Minerals

Vibrating Screen

IKAD was required to fabricate and assemble a series of radial stackers to improve ore handling and reduce downtime in the crushing system. While the base design was supplied by the client, IKAD was responsible for developing detailed fabrication drawings and executing full in-house manufacture, surface treatment, and assembly.
Vibrating Screen
09 JUL
2021
Arrow